End of life
Cabin disposal and modular building disposal
When a cabin or a modular block has nothing left to give, it stops being an asset and becomes a job. Cabin disposal is that job: broken down, separated into materials and taken off site properly rather than tipped into one skip.
The money question
Buying pays you. Disposal costs you.
This catches people out more than anything else on the site, so it is worth stating plainly before you read any further.
- A building we buy
- Has a resale value. That value pays for the lift, the transport and a figure to you. You end up better off and the cabin goes back into use somewhere else.
- A building we dispose of
- Has no resale value. Everything after the lift is cost: labour to strip it, separation of materials, haulage and the charges at the other end. You pay for that work.
- The middle ground
- Common in mixed compounds. Some units are worth buying and some are not. The value of the good ones is set against the cost of clearing the bad ones and you get one figure for the site.
- Which one you have
- Decided by condition, not by age. A twenty-year-old building that is straight and dry is stock. A ten-year-old building with a failed floor and a rotten corner is not.
We would always rather buy. It is a better outcome for you, a better outcome for us and a considerably better outcome than crushing a serviceable building. Before you accept a disposal price from anyone, it is worth checking whether what you have is actually worth money.
Send photographs and find out which it is Or read what moves the figure
Material streams
What a cabin breaks down into
A modular building is not one waste type. It is half a dozen, bolted together, and each one has to go somewhere different. Separating them on site is slower than mixing them and it is the reason disposal is a job rather than a skip on a drive.
Steel
Chassis, frame members, cladding sheets, door frames and fixings. The heaviest and most consistently recoverable stream in almost any unit, and the reason a stripped shell still has a floor value.
Boards and linings
Floor decking, joists, studwork, wall linings and boarding. Graded by condition. Clean, dry material and water-damaged, painted or treated material do not go the same way.
Electrical items
Consumer units, heaters, light fittings, fans and any equipment left in place. Removed as waste electrical and electronic equipment rather than going out with the frame.
Glazing
Windows, screens and glazed doors taken out whole where possible. Kept separate because broken glass makes every other stream harder to handle and more dangerous to sort.
Everything else
Sanitaryware, floor coverings, ceiling tiles, plasterboard and the general residue. The smallest stream by weight and the one that decides whether a job was done properly or not.
Sequencing
Clearing a site in the right order
A compound clearance is a programme, not a day. Getting the order wrong means bringing transport back for buildings that were blocked in by the ones you cleared first.
-
Assess and separate
Every unit assessed against condition. Buildings worth buying are identified and taken out of the disposal count before anything is priced.
-
Services confirmed off
Power, water, drainage and heating confirmed disconnected and made safe by someone competent to do it. Nothing is lifted or broken down while it is still connected.
-
Access route fixed
The route in and the standing position decide the order. Buildings furthest from the exit usually come out last, not first.
-
Services confirmed dead
Disconnection is arranged by you, unit by unit, before each one is due to move. A live building holds up everything behind it.
-
Purchases lifted out
Buildings we are buying go whole, on our own transport, and leave the site as stock rather than waste.
-
Disposals stripped and separated
What remains is broken down into streams and moved off in loads. Waste transfer documentation follows the material rather than trailing behind it.
Common questions
Disposal, asked and answered
What does cabin disposal cost?
It depends on the size of the unit, what it is made of, how it comes apart and how far the materials have to travel, so there is no standard figure. Send photographs and the postcode and you will get a quote for that particular job rather than a range that means nothing.
Why does disposal cost money when selling a building earns it?
Because the two jobs end differently. A sound building is stock, so its resale value covers the lift, the transport and a payment to you. An end-of-life building is a pile of mixed materials that has to be broken down, separated and sent to the right places, all of which costs labour and haulage with nothing recoverable at the end.
How do I know whether mine is worth buying or only worth clearing?
Send photographs. Roof, floor, corners, inside every room and one shot of the whole building from a distance. Failed floors, long-term water ingress, fire damage and stripped shells usually decide it. We would rather buy than dispose, so if there is value in a cabin we will find it and say so.
What happens to the materials?
They are separated rather than mixed. Steel chassis and frame go for recycling, boards and linings are graded and routed accordingly, electrical items are removed as waste electrical equipment, and glazing is taken out separately. Separating them properly is the whole point of doing the job this way.
Can you clear a compound of mixed condition buildings?
Yes, and it is common. Some bays are worth buying, some are only worth clearing, and they usually stand next to each other. We separate the two as we work through the site rather than pricing the whole compound at its worst unit, which is how a clearance budget stays sensible.
Before you pay to dispose of it, let us look
Half the buildings we are asked to scrap are worth money. Send photographs and we will tell you honestly which side of the line yours falls on.